As part of the social and environmental responsibilities of the association’s members, the aim is to develop an existing building as sustainably as possible. The building was designed in 1988 by architects Samyn & Partners and cladded with natural white stone with double glazing, according to the energy performances of the 1980s. The entire existing structure of the building is made of concrete. Tony Fretton architects from London made a preliminary feasibility study of the existing building in 2011. The aim of the project is to demonstrate how to transform an existing office into a passive office (15 kWh/m²/year) with all testing and certification from the “Passive House Platform”. To achieve necessary energy reduction to reach Passive Building certification, the existing façade is completely insulated from the inside, and all thermal bridges are eliminated. This is the first renovated passive Building and awards the BATEX (Batiment exemplaire) prize from the Brussels Region in 2013.
- Typology
- Bureaux
- Status
- Construit
- Year of conception
- 2012
- Year of delivery
- 2013
- Client
- European Foundation House
- Total budget
- 2.300.000 €
- Per m² budget
- 1000
- Constructed area
- 2200 m2