- Project
Converted rail track prolonging the cycle and walking path and footbridge
- Architect
Dessin et Construction
- Programme
- Prolongation of the railway path to the Delta multimodal station (length 1.2 km). Creation of a footbridge over the chaussée de Watermael (length 60 m, height 8 m) and modification of the status of the E411 motorway (conversion of the hard shoulder into a green cycling and walking path, reduction of the widths of the lanes and modification of the anti-noise devices).
- Typology
- Paysage, espaces urbains
- Status
- Construit
- Year of conception
- 2005
- Year of delivery
- 2010
- Client
- Projet: Bruxelles-Environnement (IBGE) - Exécution: SPFMT
- Total budget
- 5 312 000 euros HTVA €
- Per m² budget
- 265 euros / m²
chaussée de Watermael/ rue J. Cockx
1160 Bruxelles (Auderghem)
Belgium
More information
Dessin et Construction
Other projects
Other projects
- Renewal around the Church of Saint Vaast2018 – 2023Fontaine-L'Evêque
- Sambre quays and station square in Charleroi2017 – 2023Charleroi
- BRUSSELS CRUISE TERMINAL2013 – 2018Bruxelles
- Heer's place2013 – 2018Hastière