- Project
Platinum
- Architect
Archi 2000
- Programme
- Renovation of a 25.000 sq.m. office building, built in 1970. The building tells : - 3 underground levels for parkings, archive space, and technical rooms. - 13 levels above ground. The groundfloor was partially let to a post office. The remaining surface has been reserved for the entrance hall and a commercial surface.
- About
- Remodeling of this site built in 1970 and very well located at a ± 800 m distance from the “place Louise” in Brussels. A specific accent was placed on the environmental qualities, as well as on the improvement of its architectural and urban qualities. The renovated building will be very flexible in terms of its dividing options. Considering its geographic situation, it will benefit from an exceptional parking ratio. (244 spots).
- Typology
- Bureaux
- Status
- Construit
- Year of conception
- 2008
- Year of delivery
- 2010
- Client
- Valim
- Constructed area
- 25.000 m2
Other projects
Other projects
- Ducuroir2012 – 2015Bruxelles
- ROYAL GOLF CLUB SART-TILMAN2011 – 2014Liège
- K Point2006 – 2009Luxembourg
- RTBF Liège2008 – 2011Liège