Project

Tilff Bridge

Architect

Ney & Partners

Momentary association

AAST – Arcadis

Programme
The new Tilff bridge over the river Ourthe is the multimodal connection between the village of Tilff and the E25 motorway on the one hand, and the railway station, the university, its hospital and the Boncelles shopping centre on the other. The bridge and footbridge are part of the site development carried out in collaboration with AAST and Arcadis.
About
It is a double-deck bridge. The top deck has two lanes for road traffic, while the bottom deck is exclusively reserved for pedestrians and cyclists. With a total length of 137,5 m, it crosses the river and the railway tracks in three separate spans. The main span over the water is an underslung girder with a length of 84.5 m. The upper 12 m-wide reinforced concrete deck is post-tensioned by the underslung structure composed of 8 closed fully locked cables and radially oriented struts. It is an integral bridge: there are no joints or bearings on the abutment on the left bank. The space under the bridge, often neglected, is given special attention here as it forms the ceiling for the lower-level soft traffic. The concrete finish of the deck has an effect so that light can be reflected on it. The footbridge, suspended from the bridge deck, crosses the river Ourthe and leads directly from the centre of Tilff to the railway station. The width of its wooden deck varies from 7 m at its ends to a minimum of 4 m at its centre to make its use more dynamic.
Typology
Transport
Status
Construit
Year of delivery
2021
Client
SPW/Infrabel
Total budget
6000000 €
Constructed area
2000 m2

rue d'Angleur
4130 Esneux
Belgium

More information
Ney & Partners

Other projects

Other projects

Répertoire

Repertory

Consult our directory of projects in Fédération Wallonie-Bruxelles

> See all projects

Newsletter

subscribe

WBA

Place Sainctelette 2
1080 B - Brussels


+32 2 421 83 64
contact@wbarchitectures.be

back to top
Concept & Design : Salutpublic | Développement : Bien à vous