Project

Immac²

Architect

Urban Platform

Programme
Masterplan for the conversion of a school site into a living and green workplace in the heart of Tienen (in collaboration with Karad sprl)
About
This master plan is the result of an urbanistic and financial feasibility study that seeks to provide a sustainable and quality solution to this abandoned school site, taking into account its historic architectural value. The study comprises, among other things: - a feasibility study per built element; - the definition of the elements to be razed, renovated or built; - the definition of the allocation of the different elements; - the study of different scenarios by taking into account heritage aspects as well as sustainability and financial feasibility. The mission also includes the development of the selected scenario: - definition of the surfaces and estimation of the construction, renovation and restoration costs; - reduction of the technical risks (by estimating demolition costs, asbestos removal, soil tests, archaeology, etc.); - appraisal of the sales price. The mission then continued as an architecture mission, making it possible to convert former buildings into offices, a restaurant and dwellings, and to build 9 houses with a wooden structure and 10 apartments.
Typology
Logements multiples
Status
En construction
Year of conception
2014
Year of delivery
2019
Client
Collèges et Institutions Archiépiscopales de Bruxelles
Constructed area
7200 m2

3300 Tirlemont
Belgium

More information
Urban Platform

Other projects

Other projects

Répertoire

Repertory

Consult our directory of projects in Fédération Wallonie-Bruxelles

> See all projects

Newsletter

subscribe

WBA

Place Sainctelette 2
1080 B - Brussels


+32 2 421 83 64
contact@wbarchitectures.be

back to top
Concept & Design : Salutpublic | Développement : Bien à vous